ThreeEightSix has deployed a 440.40 kWp rooftop solar PV system at RMK Industries LLC in the UAE, commissioned 17/10/2023. The system reduces annual CO₂ emissions by approximately 310 Tons, with a 365.53 kWp AC output capacity. This project supports the UAE’s Net Zero 2050 strategy and demonstrates ThreeEightSix’s expertise in high-performance solar solutions.