Project Status:Under Construction
UAE (United Arab Emirates)
ThreeEightSix has commenced deployment of a 312.42 kWp rooftop solar PV system at Ashok Leyland in the UAE. The system reduces annual CO₂ emissions by approximately 220 Tons, with a 259.31 kWp AC output capacity. This project supports the UAE’s Net Zero 2050 strategy.

