Project Status:Operational
UAE (United Arab Emirates)
ThreeEightSix has deployed a 1025.70 kWp rooftop solar PV system at Dubai Furniture Manufacturing in the UAE, commissioned 22/04/2022. The system reduces annual CO₂ emissions by approximately 723 Tons, with a 851.33 kWp AC output capacity. This project supports the UAE’s Net Zero 2050 strategy.

