Project Status:Operational
UAE (United Arab Emirates)
ThreeEightSix has deployed a 1352.20 kWp rooftop solar PV system at Ezelink in the UAE, commissioned 13/05/2022. The system reduces annual CO₂ emissions by approximately 953 Tons, with a 1122.33 kWp AC output capacity. This project supports the UAE’s Net Zero 2050 strategy and demonstrates ThreeEightSix’s expertise in high-performance solar solutions.

