Project Status:Operational
UAE (United Arab Emirates)
ThreeEightSix has deployed a 849.40 kWp rooftop solar PV system at Gulf Processing Industries LLC in the UAE, commissioned 20/05/2021. The system reduces annual CO₂ emissions by approximately 599 Tons, with a 705.00 kWp AC output capacity. This project supports the UAE’s Net Zero 2050 strategy.

